您现在的位置:首页 > >

商务英语专业2012届毕业班实习大纲与方案[1]

发布时间:

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for thre e years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels mu st firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not relaxed, always maint ai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five water treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution control t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectifi cation of problems found i n place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipali tie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neeri ng , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is focusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment facility operation and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccorda nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll ution of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

2010 届商务英语专业毕业班教学实施方案

A 毕业实习部分

一、毕业实习的目的与要求

2012 届商务英语专业学生即将毕业,第六学期的主要任务是实习。作为教

学工作的重要环节之一。实习的目的是通过毕业实习培养学生综合应用知识的能

力,进一步培养学生分析问题、解决问题的能力和从事本专业工作的基本能力。

培养学生在实际工作环境中运用英语进行各种商务活动的能力。

二、毕业实习期限与方式

商务英语专业毕业实习必须按教学计划的要求,完成规定的八周时限,2012

届毕业生毕业实习时间统一安排在 2012 年开学前八周。本届毕业生实行分散式

实习模式,由学生自行联系实习单位为主,学校统一安排为辅,在开学前将实习

单位及联系方式报班主任和系部备案,以便联系和实习巡查。实习结束时,毕业

生按照规定填写商务英语专业毕业生实习鉴定表(附录一),包括实习单位意见,

加盖实习单位公章。

三、毕业实习内容

毕业实习应以专业技能的综合训练为重点,着重于所学知识和各种能力的综

合运用, 旨在全面锻炼和提高学生的商务英语专业技能,锻炼学生运用英语进行

各种商务活动的能力,为学生毕业后进入工作岗位打下良好基础。

四、对学生的要求

1、按照实习大纲、实习计划,完成规定的实习项目

2、在实践中,认真记好实习日记,及时写好实习报告;

3、服从实习单位的领导安排,注意文明礼貌,按单位规定着装,在力所能

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluti ng industrie s. Accordi ng to munici pal, a nd munici pal gover nment de ployme nt of seve n big heavy pol l ution industry reg ulation "three years a ction pla ns", requirements t o December 20 16 end of Qian, al l included s hut st opped elimi nated of e nterprise all shut stoppe d el iminated in place ; June 30, 20 17 Qian, all i ncl ude d pl ace reg ulation upgrade and agglomerati on restr ucturi ng of enter prise by unified standard reg ulation in place, late not st andard of enter prise are im plementati on disconti nue d; June 30, 2 018 Qian, all inte nds Park production of enter prise rel ocat ion Park i n pla ce, late not Park of are dis conti nue d. I n the process of renovation, wil l focus on four as pe cts: to firmly close the high energy consumpti on a nd heavy polluti on, hopeles s enter prise gover nance a nd producti on li nes, elimi nated a number of yearly emissi on i ntensit y, low val ue -added products of ba ckwar d production capacity. Second, we must strictly enfor ce the spa ce, total proje ct "Trinity" environme nt access sy stem, promoti ng industry a cce ss a nd e nvironme ntal conditions of acces s of enterpri ses to t he Park, i ndustrial park, in principle, no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repl aceme nt and r econstruction of heav ily polluting i ndustries , mergers and reorgani zations, gui de e nterpris es to e nergy cons ervation, r ecycli ng and low -carbon and cl ean producti on, a nd im prove the level of gree n devel opme nt.

Four to establis h a l ong-term supervisi on mecha nism, increase t he inte nsity of s peci al inspe ctions, inve stigate and punis h the re ctification is not in place , normal busine ss of runni ng anti -polluti on i nstallations do not. (Iii) linkage to promote flood control water, drainag e, water s uppl y, impr oving water savi ng. Speed up cros s Ya ng support river dike reinforcement, a nd al ong Pu sea wall exce pt ins urance reinfor cement, a nd Lake Qian sl uice, and BA Cao slui ce, a nd cloud cover reserv oir, focus flood control drainage e ngine ering constructi on, vigorously impleme nt ation "strong li brary" "solid di" "spread r ow" engi neering, incr eased ge ologi cal di saster hi dde n points g overna nce efforts, soli d a dva nce small basi n torre nt disa ster governa nce, efforts from esse ntially sol ution ba sin sex, and regi onal flood control drainage capa city ins ufficient of problem. V igorously impleme nt the piers, algae a nd other water sources

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Furth er soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

All localities and departments t o the village a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not relaxed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five water treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution control t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectif i cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is f ocusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment faci lity operation and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge , promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll utio n of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

及的情况下,主动协助实习单位工作;

4、严格遵守国家政策法令、企业保安保密规程、劳动纪律及其它有关制度;

5、维护学校荣誉,注意搞好校、企关系;

6、实习期间不得迟到、早退和旷课,不得随意脱离岗位,无正当理由,一律

不准请假,请假时间不得超过本次实习期限的 1/3。请教或缺席时间占实习时间

1/3 以上者,实习成绩以不及格论。

五、实习指导与巡查

尽可能选派高职称、实践经验丰富的教师担任实习指导与巡查,具体职责:

1、向学生介绍本专业目前的就业形势和主要职业方向,阐明实习大纲及实

习计划内容,明确实习目的和要求;

2、指导、帮助学生联系专业对口、业务较全面、工作量较大的单位实习;

3、指导、帮助学生解决在实习过程中面临的困难和问题;

4、指导学生写实习报告,做好学生的实习成绩考核及评定工作;

5、向教务处汇报实习巡查情况,写出书面报告。

六、实习成绩评定

实习成绩按优、良、中、及格、不及格五级记分制评定。

指导教师按照实习大纲要求,根据学生的自我鉴定、实习过程中的具体表现

以及实习单位的鉴定综合评定成绩,必要时可对学生进行考查(笔试或口试),然

后综合评定成绩,并填写商务英语专业毕业生实习鉴定表(附录一)。(在评定成

绩时要适当考虑学生在实习过程中遵守纪律的情况和劳动态度)

B 毕业论文设计部分

毕业论文设计是全部教学过程中最后一个重要的实践性教学环节,它是对学

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution industry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In the process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng industry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigate a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" engineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, efforts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

2
All localities and departments t o the vill age a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not rel axed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five wat er treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution cont rol t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectifi cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is focusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment facility operatio n and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll ution of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

生综合运用所学知识解决本专业实际问题的一次全面严格的训练。学生在教师的

指导下,根据指定的论文设计任务,收集资料,研究问题,综合运用所学知识比

较独立地完成一项专题设计。通过论文设计使学生巩固、加深和扩大所学的语言

知识,提高分析和解决问题的能力,使学生毕业后能较好地适应实际工作需要。

一、毕业论文设计的目的

毕业论文设计的目的是要进一步巩固和加强学生的基本知识的掌握和基本

技能训练,加强对学生的多学科理论、知识与技能综合运用能力的训练,加强学

生创新意识、创新能力和获取新知识能力的培养,鼓励毕业生运用所学知识独立

完成课题,培养其严谨、求实的治学方法和刻苦钻研、勇于探索的精神。

二、毕业论文设计的要求

毕业论文设计具有学术作品性质,应能表明作者在科学研究工作中取得的新

成果或提出的新见解,是作者的实践能力与专业水平的标志。毕业论文设计具有

学术作品所共有的一般属性,应按照学术作品的格式写作。(附录二)

三、时间安排

2011 年 11 月底

布置安排毕业论文设计指导工作

2011 年 12 月上旬

公布毕业论文设计选题及指导老师(附录三)

2011 年 12 月中旬

进行毕业论文设计写作指导,明确作品的格式和要



2011 年 12 月下旬

学生确定论文设计方向,指导老师帮助学生确定论



2012 年 1 月上旬

完成毕业论文设计题目汇总

2012 年 3 月初

学生写出自己论文设计的提纲,指导老师对学生作

品提出具体指导意见

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution indust ry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In t he process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng in dustry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigat e a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" eng ineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, ef forts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

3
All localities and departments t o the village a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not relaxed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five water treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution control t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectif i cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is f ocusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment faci lity operation and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge , promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll utio n of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

2012 年 4 月上旬

将作品初稿交给指导老师,指导老师提出修改意见

2012 年 4 月 30 日前 上交毕业论文设计打印稿,一式三份

2012 年 5 月 10 日

将学生论文设计打印稿交由作品答辩组成员审阅

2012 年 5 月 10—25 日 学生毕业论文设计答辩

2012 年 6 月 17-20 日 学生向系教学干事提交电子论文设计方案,提交后

方能办理离校手续

2012 年 6 月 25 日前 结束论文设计答辩各项工作

四、毕业论文设计等级评定

1、毕业论文设计按优、良、中、及格、不及格五级记分制评定。

2、2012 年 4 月初,成立 2012 届商务英语专业论文作品评审组和答辩组,

评审组由系主任、教研室主任、论文作品指导教师组成;答辩组由教研室主任和

两位具有较强的教学及专业能力的专任教师组成。

3、2012 年 5 月 10 日前,论文作品指导教师对学生毕业论文设计进行认真

评审,从文章观点、论文设计的意义、逻辑结构、文字表述等方面综合评定论文

作品等级,并填写毕业论文设计评审表。

4、2012 年 5 月 10—25 日,随机抽取 20%的学生进行论文作品答辩。每位

学生的答辩时间为 20 分钟,首先陈述自己论文作品的选题原因、创作过程、主

要观点及现实意义等,然后简要回答答辩组成员所提问题(原则上一人一问)。

答辩组根据指导教师的评审意见和学生的答辩情况,客观公正地评定学生作品等

级,并填写毕业论文设计评审表(附录四)。

5、2012 年 6 月 25 日前,毕业论文设计评审组根据指导教师和答辩组评定

等级对毕业生毕业论文设计进行综合评审,确定其作品最终等级,并填写毕业论

文作品设计评审表。

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution industry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In the process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng industry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigate a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" engineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, efforts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

4
All localities and departments t o the vill age a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not rel axed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five wat er treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution cont rol t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectifi cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is focusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment facility operatio n and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll ution of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

6、经毕业论文设计评审组确认的不合格作品,毕业生必须重做(重做完成

时间按学校相关规定),否则不能计算学分,不能取得毕业证书。

商务英语教研室 二○一一年是十二月

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution indust ry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In t he process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng in dustry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigat e a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" eng ineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, ef forts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

5
All localities and departments t o the village a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not relaxed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five water treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution control t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectif i cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is f ocusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment faci lity operation and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge , promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll utio n of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

附录一:商务英语专业毕业生实习鉴定表

湖南商务职业技术学院

毕业生实习鉴定表

姓名

性别

年龄

专业 实习单位

班级

照片

实习期限

个 人 实 习 总 结

实 习 单 位 鉴 定
教 研 室 鉴 定 评 等
系 部 鉴 定 评 等

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution industry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In the process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng industry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigate a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" engineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, efforts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

6
All localities and departments t o the vill age a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not rel axed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five wat er treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution cont rol t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectifi cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is focusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment facility operatio n and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll ution of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

附录二:商务英语专业毕业论文设计的格式及要求

1、毕业设计应包括的内容及排列的顺序

(1)封面(附录五)

(2)目录(按作品章节次序编号页码)

(3)中文摘要(300 汉字左右)、关键词(3-5 个)(英文摘要、关键词)

(4) 前言

(5)正文(要求论理正确、逻辑性强、文理通顺、层次分明、表达确切。把时

间结果上升到理论知识或应用理论的高度,最终解决实际问题,并提出自己的见

解和观点。)

(5) 结论

(6) 注释

(7) 参考文献

2、毕业论文设计打印的一般要求

(1)毕业设计一律使用 A4 打印纸。

(2)封面:统一使用商务英语专业的毕业设计封面。

(3)摘要:中文摘要采用小四号宋体字,如有英文摘要,应采用四号“Time

New Roman”字型;其中“摘要”和“关键词”这五个汉字及其对应的英文翻译应设为

黑体。

(4)目录:每章的题目用四号黑体,每节的题目用小四号宋体,并注明各

章节起始页码,题目和页码用“……”相连。

(5)毕业论文设计正文文字内容的要求:

a、正文文字内容汉字一律采用小四号宋体,数字和英文字符用小四号 Times

New Roman 字体;章采用三号黑体居中;节采用小三号黑体居中;标题用四号

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution indust ry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In t he process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng in dustry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigat e a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" eng ineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, ef forts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

7
All localities and departments t o the village a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not relaxed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five water treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution control t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectif i cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is f ocusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment faci lity operation and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge , promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll utio n of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

黑体并缩进二个汉字;图、表标题用五号黑体并居图表的中间,图形和表格内容

用五号宋体。

b、章节题目间,每节题目与正文间空一个标准行。

c、页面设置为:采用单面打印,且边距为上 2.5cm,下 2.5cm,左 2.5cm,

右 2cm,装订线 0.5cm,选择“不对称页边距”,页眉 1.8cm,页脚 1.5cm。

d、页脚设置为:插入页码,居中,从把中文摘要页设为开始第一页,即此

页为第 1 页。

e、正文选择格式段落为:最小值,15 磅,段前、段后均为 0 行。标题设置

为段前、段后均为 0.5 行或 6 磅。

f、必须利用计算机整理、打印作品。

3、毕业论文设计的正文序号

(1)、第一级序号以“一、二、三……”标示

(2)、一级以下的二级序号以(“ 一)、(二)、(三)……”标示

(3)、二级序号下的三级分别以“1、2、3……”标示

(4)、三级序号以下的四级以(“ 1)、(2)、(3)……”标示

(5)、五级序号以①,②…标示。

4、毕业论文设计的参考文献

(1)、正文引用参考文献处应以方括号标注出。如“…效率可提高到 25%[14]。”

表示此结果援引自文献 14。

(2)、参考文献的编写格式为:

a、期刊文献的格式:[编号]作者 、文章题目名、期刊名、年份、卷号、

期数、页码。

b、图书文献的格式:[编号]作者 、书名、年份、 版次、出版单位、页码。

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution industry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In the process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng industry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigate a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" engineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, efforts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

8
All localities and departments t o the vill age a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not rel axed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five wat er treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution cont rol t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectifi cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is focusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment facility operatio n and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll ution of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

附录三、商务英语专业毕业论文设计的参考选题和指导教师安排 1、 毕业设计选题(毕业生可以任选下面的题目或者自拟题目) 1)加入 WTO 后中国服务贸易面临的机遇与挑战 2)商务英语专业毕业生就业岗位之探讨 3)浅谈对商务英语的认识 4)国际贸易发展的形式分析 5)经济的全球化与中国对外贸易 6)商务谈判中应掌握的相关知识 7)英语信函写作的特点 8)文化差异对国际商务的影响 9)洋快餐与中国人的生活 10)论英语学习的原则 11)商务英语的语言特点 12)浅谈入世对我国电信业的影响及对策 13)西方翻译研究的新发展 14)中国外贸企业发展前景 15)浅议入世对我国旅游业的影响 16)东西文化差异之我见 17)论企业品牌经营及打造品牌竞争 18)入世后外贸银行竞争策略及影响 19)商务英语在中国加入 WTO 后的新趋势

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution indust ry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In t he process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng in dustry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigat e a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" eng ineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, ef forts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

9
All localities and departments t o the village a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not relaxed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five water treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution control t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectif i cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is f ocusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment faci lity operation and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge , promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll utio n of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

20)商务英语的课程设置之我见

21)商务谈判中应注意的若干问题

22)英语口语或语法在商务领域中的应用

23)商务谈判中英语的作用

24)提高商务英语阅读速度的主要障碍及其对策

25)通过扩大知识面提高英语阅读能力

26)阅读英文报刊的好处

27)如何翻译好日常商务文书

28)商务英语专业毕业生应该具备的基本商务能力

29)商务英语教学改革的方向

30)商务英语教学改革的途径

31)商务英语专业的课程设置

32)商务英语教学在新形势下的影响和意义;

33)我国贸易的现状及其发展方向

34)商务英文翻译技巧;

35)湖南招商引资探讨及其对策

36)WTO保护期过后对我国的影响;

37) 跨文化因素对英汉翻译的影响

38) 商务英语的特点及翻译技巧

39)商务英语函电在对外贸易中的作用

40)商务英语函电翻译技巧

41)WTO 与我国反倾销探讨

42) 浅谈商务英语写作时避免修饰语错位的方法

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution industry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In the process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng industry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigate a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" engineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, efforts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

10
All localities and departments t o the vill age a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not rel axed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five wat er treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution cont rol t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectifi cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is focusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment facility operatio n and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll ution of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

43) 商务函电翻译的用词技巧

44) 社会文化迁移对中国式英语的影响

45) 商务英语专业口语课程教学探讨

46) 商务英语写作的研究

47)学生商务英语写作中的错误与商务英语写作教学之间的关系

48) 定语从句运用时常见错误及其原因分析

49) 汉译英中遇到新词语的译法问题

50) 英汉互译中词义的不对应(文化意义、风格意义、修辞意义等)

51) 形象语在写作中的修辞效果

52) 汉语中新词汇的翻译技巧

53) 商务英语的特征与翻译

54) 单证员在国际贸易中的地位

55) 浅谈涉外合同英语特色

56) 如何应对 BECV 考试

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution indust ry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In t he process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng in dustry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigat e a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" eng ineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, ef forts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

11
All localities and departments t o the village a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not relaxed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five water treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution control t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectif i cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is f ocusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment faci lity operation and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge , promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll utio n of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

附录四:商务英语专业毕业论文设计评审表

人文与艺术系学生毕业论文设计评审表

学生姓名

班级

学号

学制

作品题目

指导老师姓名

指导老师职称

作品内容摘要

评定等级
指导老师评议
评定等级 答辩小组意见 系毕业作品、 评定等级 设计评审委员
会意见

指导老师签名: 年月日
答辩组老师签名: 年月日
系评审委员会主任签名: 年月日

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution industry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In the process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng industry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigate a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" engineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, efforts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

12
All localities and departments t o the vill age a nd "no unaut horise d" created

videoconfere nce , Secretary of the pr ovincial Committee of Xia Baol ong stre sse d: thi s year is the "five water treatment" "357" timetables "for three years to re solve outsta ndi ng iss ues, obvi ously worke d," victory of the year.

The County's de partments at al l levels must firmly establis h the " guanghui is g old a nd silver" green devel opment conce pt, convi nce d that Ca stle is not rel axed, always maintai ning strategic ability and strong determinati on t o improve t he envir onme nt, consi stently playi ng well "five wat er treatment of" winning t he war, ever-higher l evels of compre hensive well -off society was built. (A) lay the sewage uphill battle. This ye ar we will "river water quality im proved at t he county level, up to five" this basi c obje ctive grasp of poll ution cont rol t hat focus, wit h the focus on three t hings : a good j ob, " clear rivers" reaching t he County created. Organization "look back" s pecial ins pe ction, the County garbage River, bla ck and odor ous River i s "Dragnet" investigation, timely rectifi cation of problems found in place firmly to prevent river poll ution rebound. In a ccordance wit h the " one -stop strategy", improving t he inferi or five water quality monit oring

stations w ork this ye ar to ensure t he Eliminati on of 1 provincial contr ol, five water quality secti on 3 muni cipalitie s controlle d deteri oration, ensure t he creati on thi s year of "clear rivers" sta ndards. Se cond, pay spe cial attenti on to poll ution-cutting construction of na notubes . Intercepting nanotube s are the ba sis of poll ution of water source e ngineering, engi neering , matter of succes s or failure of water management. Ur ba n sewage treatment, t o improve "effluent from se wage treatment rate, running a ccuracy, complia nce" re quirement , spe ed up the t own' s support netw ork constr uction, is focusi ng on na notubes home "last meters" question. D omestic sewage treatment in r ural areas, t his year is t he final year of the three -year acti on, determinati on to fight a nd t he moment um around, ending the battle on whi ch ful ly to ensure the realization of all County 648 forme d village coverag e. Also, be s ure to attach importa nce t o focus on rural domestic wastewater treatment facility operatio n and manageme nt, ensure t hat wastewater treatment facility up a nd runni ng, rol e play, avoid t he "Sun" probl em. Third, pay s peci al attention to the River Lake pond des ilting operation.

Provinces now have focused on poll ution control of water go to "dig up mud", as the deepeni ng water of this year's "play s".

Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, in a ccor da nce wit h the "one rive r one policy" requires detailed clea ning, dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote s cie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i ndustries. Poll ution of water must grab the source, wastew ater is primarily the source of backwar d production ca pacit y, increase the intensity of

附录五:商务英语专业毕业论文设计封面

湖南商务职业技术学院毕业设计

论文(设计)标题

作 者: 姓名 指导老师: 姓名 完成日期:

班级 职称

湖南商务职业技术学院制

为了促进本公司各项经营活动由事后管理向前方式的转变,强化生产全过程控制提高资金使用计划性特定办法以增加运行透明度treatment of heavily polluting i ndustries . Accordi ng to muni cipal , and muni cipal g overnment depl oyment of seve n big heavy pollution indust ry regulation "three years a ction plans", requir ements to D ecember 2016 e nd of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 3 0, 201 7 Qia n, all included place regulati on upgrade a nd aggl omeration restr uct uring of enter prise by unified standard reg ulation in pl ace, late not standard of enterpri se are impleme ntation dis conti nue d; June 30, 2 018 Qian, all intends Park production of enterpri se relocati on Park i n pla ce, late not Park of are di scontinued. In t he process of renovati on, wi ll focus on four as pects : to firmly clos e the high energy cons umption and heavy polluti on, hopeles s enter prise gover nance a nd pr oducti on li nes, elimi nated a number of yearly emission intensity, l ow value -adde d pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce t he s pace , total proj ect "Trinity" environme nt access system, promoti ng in dustry a cce ss and envir onme ntal conditi ons of access of e nterprise s to the Park, industrial park, in principle , no l onger t he cla ss on the new

proje ct. Thir dly, promoti ng repla cement a nd re construction of heavily polluti ng industrie s, mergers and reorgani zations, gui de e nterprise s to energy conservati on, re cycling a nd l ow-carbon a nd clean production, and improve the level of green development.

Four to establish a l ong -term supervision mecha nism, i ncrea se the inte nsity of s pecial ins pe ctions, investigat e a nd punish t he rectificati on is not i n pla ce, normal busine ss of runni ng anti -polluti on installations do not . (Iii) linkage to prom ote flood control water, drainag e, water suppl y, improvi ng water saving . Spee d up cross Yang s upport river dike rei nforceme nt, and a long Pu s eawall exce pt ins urance reinfor cement, a nd Lake Qia n sl uice, a nd BA Ca o sl uice, a nd cloud cover reserv oir, focus flood control drai nage engi neeri ng constr uction, vigor ously im plementation "strong l ibrary" "solid di" "spread r ow" eng ineering , increa s ed geol ogical disaster hi dden point s governa nce efforts, soli d advance small basi n torrent di saster gover nance, ef forts from esse ntially s olution ba sin sex, a nd regi onal flood control drai nage ca pacity i nsufficie nt of problem. V igorously impleme nt the pi ers, algae a nd ot her water s ource s

protecti on a nd, promoti ng rural dri nking water safety projects , setting up water pri cing reform and envir onmental protecti on me cha nism, gui ding water dept h. Further soi l poll ution and repai r, strengt hen agri cult ural non-poi nt source poll ution preventi on, m ountai n, water, forests, fields, lakes, va rious el ements mut ual long. Four, manage to tig hten contr ol, to play "three t o split" battle. Xia Baol ong, Se cretary of provi nci al party Committee stressed t hat whil e the "three to split" operation time is over three year s, but "thre e to spl it" must continue to catch on, and resolv e a split cannot be changed.

13
All localities and departments t o the village a nd "no unaut horise d" created



热文推荐
猜你喜欢
友情链接: 简历 面试求职范文 职业规划 自我管理 社交礼仪 76242百科